Data for Power Outage of the Philippines from 2019 - 2021

Published by Energy Regulatory Commission(ERC) on Nov. 25, 2022.
Requested from ERC by L. Borres at 04:18 PM on Nov. 25, 2022.
Purpose: Research and Market Study in alignment with the Department Circular for Smart Grid
Date of Coverage: 01/01/2019 - 01/01/2022
Tracking no: #ERC-232414595216

CONTESTABLE CUSTOMERS IN ZAMBOANGA

Published by Energy Regulatory Commission(ERC) on Nov. 24, 2022.
Requested from ERC by D. Lu at 12:08 PM on Nov. 24, 2022.
Purpose: Market Research
Date of Coverage: 11/23/2022 - 11/23/2022
Tracking no: #ERC-386988583349

CONTESTABLE CUSTOMERS IN ZAMBOANGA

Published by Energy Regulatory Commission(ERC) on Nov. 23, 2022.
Requested from ERC by D. Lu at 10:44 AM on Nov. 23, 2022.
Purpose: Market Research
Date of Coverage: 11/23/2022 - 11/23/2022
Tracking no: #ERC-371161116229

Forward Contracting for RCOA or Contestable Customers?

Published by Energy Regulatory Commission(ERC) on Nov. 21, 2022.
Requested from ERC by D. Lu at 09:55 AM on Nov. 21, 2022.
Purpose: Research and Data Gathering
Date of Coverage: 11/21/2022 - 11/21/2022
Tracking no: #ERC-034488885847

Policies on limitations on Greenhouse gas emissions in Power plants

Published by Energy Regulatory Commission(ERC) on Nov. 17, 2022.
Requested from ERC by E. Morada at 08:10 PM on Nov. 17, 2022.
Purpose: Thesis
Date of Coverage: 11/17/2010 - 11/17/2022
Tracking no: #ERC-526649647339

Memo or policy about forward contracting between private entities

Published by Energy Regulatory Commission(ERC) on Nov. 17, 2022.
Requested from ERC by D. Lu at 04:25 PM on Nov. 17, 2022.
Purpose: Research
Date of Coverage: 11/07/2022 - 11/07/2022
Tracking no: #ERC-618039586755

Distribution Utilities Contract Case No. Files

Published by Energy Regulatory Commission(ERC) on Nov. 17, 2022.
Requested from ERC by D. Lu at 09:45 AM on Nov. 17, 2022.
Purpose: Research and Data Gathering
Date of Coverage: 11/01/2022 - 11/17/2022
Tracking no: #ERC-934880814120

Contestable Customers in Mindanao

Published by Energy Regulatory Commission(ERC) on Nov. 17, 2022.
Requested from ERC by D. Lu at 09:43 AM on Nov. 17, 2022.
Purpose: Research and Prospecting
Date of Coverage: 09/01/2022 - 10/31/2022
Tracking no: #ERC-210012724392

Contestable Customers in Mindanao

Published by Energy Regulatory Commission(ERC) on Nov. 17, 2022.
Requested from ERC by D. Lu at 09:35 AM on Nov. 17, 2022.
Purpose: Research and Prospecting
Date of Coverage: 11/16/2022 - 11/16/2022
Tracking no: #ERC-359760090831

DUs Contract - Case No. Files

Published by Energy Regulatory Commission(ERC) on Nov. 17, 2022.
Requested from ERC by D. Lu at 08:23 AM on Nov. 17, 2022.
Purpose: Research and Data Gathering
Date of Coverage: 11/15/2005 - 11/15/2022
Tracking no: #ERC-180753333071

Capital costs of power plants in Mindanao

Published by Energy Regulatory Commission(ERC) on Nov. 17, 2022.
Requested from ERC by E. Morada at 08:22 AM on Nov. 17, 2022.
Purpose: Thesis
Date of Coverage: 11/15/2000 - 11/15/2022
Tracking no: #ERC-903426813715

Frequency of outages in Negros Grid

Published by Energy Regulatory Commission(ERC) on Nov. 14, 2022.
Requested from ERC by J. Bajao at 09:57 AM on Nov. 14, 2022.
Purpose: Research
Date of Coverage: 01/01/2017 - 11/14/2022
Tracking no: #ERC-503339704601



Detailed Electricity

Published by Energy Regulatory Commission(ERC) on Nov. 9, 2022.
Requested from ERC by A. Andus at 08:54 PM on Nov. 9, 2022.
Purpose: Small scale rooftop solar market potential study
Date of Coverage: 01/01/2020 - 03/01/2022
Tracking no: #ERC-379241696798

Request for Copy of Annexes

Published by Energy Regulatory Commission(ERC) on Nov. 8, 2022.
Requested from ERC by A. Matabang at 02:14 PM on Nov. 8, 2022.
Purpose: Research / Thesis
Date of Coverage: 05/01/2015 - 05/31/2015
Tracking no: #ERC-938671154387

Clarification on the Requirements for Prepaid Metering (ERC Resolution No. 17 Series of 2012)

Published by Energy Regulatory Commission(ERC) on Nov. 8, 2022.
Requested from ERC by A. Matabang at 02:08 PM on Nov. 8, 2022.
Purpose: Research / Thesis
Date of Coverage: 11/01/2022 - 11/08/2022
Tracking no: #ERC-364076294487

Average cost of electricity from 2013 to present

Published by Energy Regulatory Commission(ERC) on Nov. 7, 2022.
Requested from ERC by J. Ramos at 10:11 PM on Nov. 7, 2022.
Purpose: Masters Requirement
Date of Coverage: 01/01/2013 - 11/07/2022
Tracking no: #ERC-865660071607



List of Potential Contestable Customers in Mindanao

Published by Energy Regulatory Commission(ERC) on Nov. 7, 2022.
Requested from ERC by N. Dulay at 12:24 PM on Nov. 7, 2022.
Purpose: Research and Development
Date of Coverage: 09/01/2022 - 11/07/2022
Tracking no: #ERC-962537851044

POWER DISTRIBUTION UTILITIES CONTRACT AND RATES

Published by Energy Regulatory Commission(ERC) on Nov. 7, 2022.
Requested from ERC by D. Lu at 11:06 AM on Nov. 7, 2022.
Purpose: Research and Data Gathering
Date of Coverage: 11/07/2022 - 11/07/2022
Tracking no: #ERC-358665781575

NEA EQUIPMENT AND MATERIALS PRICE INDEX 2021 AND 2020

Published by Energy Regulatory Commission(ERC) on Nov. 3, 2022.
Requested from ERC by M. Grencio at 01:51 PM on Nov. 3, 2022.
Purpose: Research and guidelines
Date of Coverage: 01/01/2020 - 12/31/2021
Tracking no: #ERC-023432415373

SAIFI AND SAIDI OF ELECTRIC DISTRIBUTION COMPANIES

Published by Energy Regulatory Commission(ERC) on Oct. 31, 2022.
Requested from ERC by B. Kate Ann Rose B at 11:15 AM on Oct. 31, 2022.
Purpose: ARCHITECTURAL THESIS
Date of Coverage: 10/31/2022 - 10/31/2022
Tracking no: #ERC-456280635764

Distribution System and Daily/Monthly Load of the Municipality of Albuera, Leyte.

Published by Energy Regulatory Commission(ERC) on Oct. 31, 2022.
Requested from ERC by J. Barsobia at 08:58 AM on Oct. 31, 2022.
Purpose: Final Project
Date of Coverage: 01/01/2021 - 12/31/2021
Tracking no: #ERC-912324537560

Single Line Diagram of the substation supplying electric power to Brgy. Mayapa, Calamba, Laguna

Published by Energy Regulatory Commission(ERC) on Oct. 24, 2022.
Requested from ERC by R. Cuya at 09:52 AM on Oct. 24, 2022.
Purpose: Existing site utilities study
Date of Coverage: 10/24/2017 - 10/24/2022
Tracking no: #ERC-597218239558

MERALCO-Canlubang Existing Simple and Geographic Single Line Diagram

Published by Energy Regulatory Commission(ERC) on Oct. 24, 2022.
Requested from ERC by R. Cuya at 09:40 AM on Oct. 24, 2022.
Purpose: existing Site utilities study
Date of Coverage: 10/24/2017 - 10/24/2022
Tracking no: #ERC-280194698740

System Loss of Electric Distribution Utilities for 2015 and 2016

Published by Energy Regulatory Commission(ERC) on Oct. 19, 2022.
Requested from ERC by R. Carmelotis at 10:18 AM on Oct. 19, 2022.
Purpose: Supporting document for petition
Date of Coverage: 01/01/2015 - 12/31/2016
Tracking no: #ERC-590203296994

BAR No. 1 and FAR No. 1-A and FAR No. 1-B and FAR No. 3

Published by Energy Regulatory Commission(ERC) on Oct. 18, 2022.
Requested from ERC by S. Mendoza at 09:34 PM on Oct. 18, 2022.
Purpose: Research Purpose
Date of Coverage: 01/01/2021 - 12/31/2021
Tracking no: #ERC-033696603782

Ancillary Procurement Plan

Published by Energy Regulatory Commission(ERC) on Oct. 18, 2022.
Requested from ERC by A. Delmo at 03:26 PM on Oct. 18, 2022.
Purpose: Research
Date of Coverage: 10/01/2022 - 10/18/2022
Tracking no: #ERC-849532139879

SAIFI, SAIDI, CAIDI, MAIFI of ECs in MIMAROPA Region

Published by Energy Regulatory Commission(ERC) on Oct. 18, 2022.
Requested from ERC by C. Cabadido at 02:52 PM on Oct. 18, 2022.
Purpose: Research
Date of Coverage: 01/01/2005 - 12/31/2021
Tracking no: #ERC-124113720144

Supplier and Transmission Data

Published by Energy Regulatory Commission(ERC) on Oct. 18, 2022.
Requested from ERC by A. Delmo at 10:48 AM on Oct. 18, 2022.
Purpose: Research
Date of Coverage: 01/01/2022 - 10/18/2022
Tracking no: #ERC-754453659842

Active Power Contracts in Mindanao

Published by Energy Regulatory Commission(ERC) on Oct. 18, 2022.
Requested from ERC by A. Delmo at 09:06 AM on Oct. 18, 2022.
Purpose: Research
Date of Coverage: 09/01/2022 - 10/18/2022
Tracking no: #ERC-189671450900

Number of Customers Served by Meralco

Published by Energy Regulatory Commission(ERC) on Oct. 6, 2022.
Requested from ERC by A. Dinoso at 03:39 PM on Oct. 6, 2022.
Purpose: Research
Date of Coverage: 01/01/2018 - 03/18/2022
Tracking no: #ERC-695733508283

Monthly Electricity Rates of Distribution Utilities in the Philippines

Published by Energy Regulatory Commission(ERC) on Sept. 21, 2022.
Requested from ERC by J. Violon at 01:32 PM on Sept. 21, 2022.
Purpose: Research and development
Date of Coverage: 01/01/2021 - 08/31/2022
Tracking no: #ERC-447367102598

Total electrical consumption in the Albay Region

Published by Energy Regulatory Commission(ERC) on Sept. 21, 2022.
Requested from ERC by R. Blanderos at 07:14 AM on Sept. 21, 2022.
Purpose: Research
Date of Coverage: 09/15/2022 - 09/15/2022
Tracking no: #ERC-136773285356

Meter Division Personnel

Published by Energy Regulatory Commission(ERC) on Sept. 20, 2022.
Requested from ERC by S. Tan at 09:36 AM on Sept. 20, 2022.
Purpose: Research/Kwh Meter Branding
Date of Coverage: 07/01/2022 - 09/20/2022
Tracking no: #ERC-533843026902

organizational chart with staffing pattern or contact person

Published by Energy Regulatory Commission(ERC) on Sept. 20, 2022.
Requested from ERC by S. Tan at 07:36 AM on Sept. 20, 2022.
Purpose: Research
Date of Coverage: 07/01/2022 - 09/20/2022
Tracking no: #ERC-858046223433

Latest Contestable Market as of 2022

Published by Energy Regulatory Commission(ERC) on Sept. 16, 2022.
Requested from ERC by R. Sumang at 03:57 PM on Sept. 16, 2022.
Purpose: For Research
Date of Coverage: 09/16/2022 - 09/16/2022
Tracking no: #ERC-564086430742

SAIFI, SAIDI, CAIDI, MAIFI of DUs and ECs

Published by Energy Regulatory Commission(ERC) on Sept. 15, 2022.
Requested from ERC by K. Ujano at 08:54 AM on Sept. 15, 2022.
Purpose: Research
Date of Coverage: 01/01/2021 - 08/31/2022
Tracking no: #ERC-385861645482

2021 System Loss for Philippine Distribution Utilities (Private and EC)

Published by Energy Regulatory Commission(ERC) on Sept. 14, 2022.
Requested from ERC by J. Orsal at 01:47 PM on Sept. 14, 2022.
Purpose: Research
Date of Coverage: 01/01/2021 - 12/31/2021
Tracking no: #ERC-313421975924

2021-2022 Unblended Generation Rates

Published by Energy Regulatory Commission(ERC) on Sept. 12, 2022.
Requested from ERC by M. Losañez at 08:47 PM on Sept. 12, 2022.
Purpose: Research
Date of Coverage: 01/01/2021 - 09/12/2022
Tracking no: #ERC-207022820610

2021-2022 Mindanao Distribution Utilities Generation Cost and type of Power Suppliers/Gencos

Published by Energy Regulatory Commission(ERC) on Sept. 8, 2022.
Requested from ERC by L. Carrillo at 05:20 PM on Sept. 8, 2022.
Purpose: Research, marketing
Date of Coverage: 06/01/2021 - 09/08/2022
Tracking no: #ERC-638232611526

2022 Distribution Utilities Fact Sheets

Published by Energy Regulatory Commission(ERC) on Sept. 8, 2022.
Requested from ERC by L. Carrillo at 05:17 PM on Sept. 8, 2022.
Purpose: Research, marketing
Date of Coverage: 01/01/2022 - 09/08/2022
Tracking no: #ERC-501864785174

Number of Households with Electricity

Published by Energy Regulatory Commission(ERC) on Sept. 7, 2022.
Requested from ERC by A. San Diego at 07:51 PM on Sept. 7, 2022.
Purpose: Reseearch
Date of Coverage: 01/01/2019 - 08/01/2022
Tracking no: #ERC-485445922501

Electric Distribution and Transmission Lines

Published by Energy Regulatory Commission(ERC) on Sept. 7, 2022.
Requested from ERC by D. Sepulvida at 03:27 PM on Sept. 7, 2022.
Purpose: Research and Development
Date of Coverage: 09/07/2022 - 09/07/2022
Tracking no: #ERC-610798661328

ERC ( ENERGY REGULATORY COMMISSION) ACTIVE EMAIL ADDRESS

Published by Energy Regulatory Commission(ERC) on Sept. 2, 2022.
Requested from ERC by C. Siruet at 11:52 AM on Sept. 2, 2022.
Purpose: SEMINAR/ORIENTATION
Date of Coverage: 09/02/2022 - 09/02/2022
Tracking no: #ERC-780520881536

Generation Charge/Rate Jan 2021 - Aug 2022

Published by Energy Regulatory Commission(ERC) on Sept. 1, 2022.
Requested from ERC by C. Estrada at 09:06 AM on Sept. 1, 2022.
Purpose: Research and development
Date of Coverage: 01/01/2021 - 08/31/2022
Tracking no: #ERC-016082573024

Table of Organization

Published by Energy Regulatory Commission(ERC) on Aug. 30, 2022.
Requested from ERC by S. Tan at 11:11 AM on Aug. 30, 2022.
Purpose: Research about responsible persons to talk to
Date of Coverage: 07/01/2022 - 08/30/2022
Tracking no: #ERC-877186800829

Electric Load Curve in Pilillia, Rizal

Published by Energy Regulatory Commission(ERC) on Aug. 27, 2022.
Requested from ERC by A. Alaguena at 11:08 PM on Aug. 27, 2022.
Purpose: For Research and Development, Powerplant Report
Date of Coverage: 01/01/2015 - 12/31/2021
Tracking no: #ERC-832746301886

Uncontracted Capacities of DUs in Luzon

Published by Energy Regulatory Commission(ERC) on Aug. 24, 2022.
Requested from ERC by L. Albino at 04:56 PM on Aug. 24, 2022.
Purpose: For research and market analysis
Date of Coverage: 01/01/2021 - 08/24/2022
Tracking no: #ERC-839880288756

2021-2022 Power Rates and Unblended General Rates

Published by Energy Regulatory Commission(ERC) on Aug. 23, 2022.
Requested from ERC by M. Losañez at 08:53 PM on Aug. 23, 2022.
Purpose: Research
Date of Coverage: 01/01/2021 - 08/23/2022
Tracking no: #ERC-281440478607

Average Annual Electricity Rates (P/kWh) of Selected Distribution Utilities

Published by Energy Regulatory Commission(ERC) on Aug. 18, 2022.
Requested from ERC by A. Ignacio at 09:50 AM on Aug. 18, 2022.
Purpose: Research & Dev
Date of Coverage: 01/31/2021 - 12/31/2021
Tracking no: #ERC-918634269539

Request for clarification on computation of power cost and imposition of charges

Published by Energy Regulatory Commission(ERC) on Aug. 10, 2022.
Requested from ERC by M. Mejia at 02:36 PM on Aug. 10, 2022.
Purpose: Clarification requested by the BOD of Digos Water District in relation to its operation.
Date of Coverage: 01/01/2022 - 07/31/2022
Tracking no: #ERC-852605644272

Number of CCs per RES from September to December 2016

Published by Energy Regulatory Commission(ERC) on Aug. 8, 2022.
Requested from ERC by F. Panique at 11:29 AM on Aug. 8, 2022.
Purpose: Research
Date of Coverage: 09/01/2016 - 12/31/2016
Tracking no: #ERC-942835474036

Uncontracted Capacities of Distribution Utilities in Visayas

Published by Energy Regulatory Commission(ERC) on Aug. 6, 2022.
Requested from ERC by M. Losañez at 09:33 PM on Aug. 6, 2022.
Purpose: Research
Date of Coverage: 01/01/2016 - 08/05/2022
Tracking no: #ERC-564910021611

Electricity Distribution System Plan for MERALCO-Calamba

Published by Energy Regulatory Commission(ERC) on Aug. 2, 2022.
Requested from ERC by R. Cuya at 03:23 PM on Aug. 2, 2022.
Purpose: Existing Power Distribution Utility Study
Date of Coverage: 01/01/2018 - 08/01/2022
Tracking no: #ERC-443766723420

Performance assessment through load analysis of power lines in Calamba, Laguna

Published by Energy Regulatory Commission(ERC) on Aug. 2, 2022.
Requested from ERC by R. Cuya at 02:36 PM on Aug. 2, 2022.
Purpose: Existing Electricity Distribution System Study
Date of Coverage: 01/01/2018 - 08/01/2022
Tracking no: #ERC-864353063103

Electricity Sales of MERALCO-Calamba every month from Jan 2018- Dec 2022

Published by Energy Regulatory Commission(ERC) on Aug. 2, 2022.
Requested from ERC by R. Cuya at 02:34 PM on Aug. 2, 2022.
Purpose: To develop an existing power distribution utility study
Date of Coverage: 01/01/2018 - 08/01/2022
Tracking no: #ERC-676218599794

Reliability Indices of MERALCO-Calamba's substations every year 2018-2022

Published by Energy Regulatory Commission(ERC) on Aug. 2, 2022.
Requested from ERC by R. Cuya at 02:29 PM on Aug. 2, 2022.
Purpose: To develop an interactive Geographical Information System Map
Date of Coverage: 08/02/2018 - 08/02/2022
Tracking no: #ERC-768341317236

Most updated Distribution Development Plan (DDP) of MERALCO-Calamba every year from 2018-2022

Published by Energy Regulatory Commission(ERC) on Aug. 2, 2022.
Requested from ERC by R. Cuya at 02:23 PM on Aug. 2, 2022.
Purpose: existing power distribution study
Date of Coverage: 08/02/2018 - 08/02/2022
Tracking no: #ERC-458385804391

Application for the Rate Increase

Published by Energy Regulatory Commission(ERC) on Aug. 2, 2022.
Requested from ERC by J. Dorado at 02:21 PM on Aug. 2, 2022.
Purpose: Customer research on the impact of the proposed rate increase by San Miguel plants (Sual and Ilijan)
Date of Coverage: 07/17/2022 - 08/01/2022
Tracking no: #ERC-586803392301

MERALCO-Calamba Existing Simple and Geographic Single Line Diagram

Published by Energy Regulatory Commission(ERC) on Aug. 2, 2022.
Requested from ERC by R. Cuya at 02:21 PM on Aug. 2, 2022.
Purpose: To develop a Geographic Information System Map
Date of Coverage: 08/02/2018 - 08/02/2022
Tracking no: #ERC-150424511133

Grid Map and Electrical SLD of Siquijor

Published by Energy Regulatory Commission(ERC) on July 28, 2022.
Requested from ERC by M. Vicedo at 02:09 PM on July 28, 2022.
Purpose: Research and Development
Date of Coverage: 07/01/2022 - 07/28/2022
Tracking no: #ERC-814057923616

May 2017 CREM Report, September - December 2016 # of CCs

Published by Energy Regulatory Commission(ERC) on July 27, 2022.
Requested from ERC by F. Panique at 09:18 AM on July 27, 2022.
Purpose: Research
Date of Coverage: 09/01/2016 - 05/31/2017
Tracking no: #ERC-656038549447

Power Supply Agreements of SURIGAO DEL NORTE COOPERATIVE with independent power producers

Published by Energy Regulatory Commission(ERC) on July 26, 2022.
Requested from ERC by K. Labordo at 11:38 AM on July 26, 2022.
Purpose: Legal research for petition of consumers.
Date of Coverage: 01/01/2012 - 07/25/2022
Tracking no: #ERC-883935243243

Capacity Factors of Power Plants

Published by Energy Regulatory Commission(ERC) on July 22, 2022.
Requested from ERC by C. Estrada at 11:00 AM on July 22, 2022.
Purpose: Research and Development
Date of Coverage: 01/01/2017 - 06/28/2022
Tracking no: #ERC-278082790112

Latest CREM Report and Latest Quarterly Average RES Prices

Published by Energy Regulatory Commission(ERC) on July 21, 2022.
Requested from ERC by F. Panique at 08:11 AM on July 21, 2022.
Purpose: Research
Date of Coverage: 04/01/2022 - 06/30/2022
Tracking no: #ERC-851422243030

Power Supply Agreement

Published by Energy Regulatory Commission(ERC) on July 20, 2022.
Requested from ERC by M. Losañez at 08:18 PM on July 20, 2022.
Purpose: Research
Date of Coverage: 07/20/2022 - 07/20/2022
Tracking no: #ERC-658475186052

Performance Report of Distribution Utilities

Published by Energy Regulatory Commission(ERC) on July 20, 2022.
Requested from ERC by A. Madarang at 09:52 AM on July 20, 2022.
Purpose: Research and development (for thesis)
Date of Coverage: 01/01/2015 - 12/31/2021
Tracking no: #ERC-402349223564

List of Solar Power Plants in Mindanao

Published by Energy Regulatory Commission(ERC) on July 14, 2022.
Requested from ERC by E. Vinuya at 02:43 PM on July 14, 2022.
Purpose: Research
Date of Coverage: 01/01/2000 - 07/14/2022
Tracking no: #ERC-059803723185

Every Distribution Planning Studies (DPS) of PDU MERALCO from 2017-2021

Published by Energy Regulatory Commission(ERC) on June 28, 2022.
Requested from ERC by N. Compay at 09:46 AM on June 28, 2022.
Purpose: To develop an interactive Geographical Information System Map. Identify load growth and load pattern
Date of Coverage: 01/01/2017 - 12/31/2021
Tracking no: #ERC-856451184933

Historical Peak Loading in MW of all of MERALCO’s substations 2017-2021, with forecast to 2026

Published by Energy Regulatory Commission(ERC) on June 28, 2022.
Requested from ERC by N. Compay at 09:42 AM on June 28, 2022.
Purpose: To develop an interactive Geographical Information System Map. Identify load growth and load pattern
Date of Coverage: 01/01/2017 - 12/31/2021
Tracking no: #ERC-951563806102

Substation Reliability Indices of MERLACO for every year from 2017-2021

Published by Energy Regulatory Commission(ERC) on June 28, 2022.
Requested from ERC by N. Compay at 09:32 AM on June 28, 2022.
Purpose: To develop an interactive Geographical Information System Map. Identify reliability scales
Date of Coverage: 01/01/2017 - 12/31/2021
Tracking no: #ERC-888058166423

Every Distribution Development Plan (DDP) of PDU MERALCO from 2001-2010 as per PDC 2001 Sec. 6.2.5

Published by Energy Regulatory Commission(ERC) on June 28, 2022.
Requested from ERC by N. Compay at 09:27 AM on June 28, 2022.
Purpose: to research existing power distribution Studies
Date of Coverage: 01/01/2001 - 12/31/2010
Tracking no: #ERC-831533735230

Every Distribution Development Plan (DDP) of PDU MERALCO from 2010-2016 as per PDC 2017 Sec. 5.2.5

Published by Energy Regulatory Commission(ERC) on June 28, 2022.
Requested from ERC by N. Compay at 09:25 AM on June 28, 2022.
Purpose: to research existing power distribution Studies
Date of Coverage: 01/01/2010 - 12/31/2016
Tracking no: #ERC-176459126230

Every Distribution Development Plan (DDP) of PDU MERALCO from 2017-2020 as per PDC 2017 Sec. 5.2.5

Published by Energy Regulatory Commission(ERC) on June 28, 2022.
Requested from ERC by N. Compay at 09:17 AM on June 28, 2022.
Purpose: to research existing power distribution Studies
Date of Coverage: 01/01/2017 - 12/31/2020
Tracking no: #ERC-336484980254

MERALCO's Existing Simple and Geographic Single Line Diagram

Published by Energy Regulatory Commission(ERC) on June 28, 2022.
Requested from ERC by N. Compay at 09:02 AM on June 28, 2022.
Purpose: To develop a Geographic Information System Map showing 500kV 230kV 69kV, 34.5kV, and 13.8kv lines
Date of Coverage: 01/01/2017 - 12/31/2021
Tracking no: #ERC-376443398951

Single Line Diagram of Mindanao island

Published by Energy Regulatory Commission(ERC) on June 27, 2022.
Requested from ERC by E. Fernandez at 11:42 AM on June 27, 2022.
Purpose: Research/Thesis
Date of Coverage: 06/27/2022 - 06/27/2022
Tracking no: #ERC-625121250404

APPEAL Reliability Indices of CEPALCO's substations every year 2017-2021

Published by Energy Regulatory Commission(ERC) on June 23, 2022.
Requested from ERC by N. Compay at 10:12 AM on June 23, 2022.
Purpose: To develop an interactive Geographical Information System Map. Identify reliability scales
Date of Coverage: 01/01/2017 - 12/31/2021
Tracking no: #ERC-684945740716

APPEAL Reliability Indices of BUSECO's substations every year 2017-2021

Published by Energy Regulatory Commission(ERC) on June 23, 2022.
Requested from ERC by N. Compay at 10:09 AM on June 23, 2022.
Purpose: To develop an interactive Geographical Information System Map. Identify reliability scales
Date of Coverage: 01/01/2017 - 12/31/2021
Tracking no: #ERC-600153566234

2017-2021 Distribution Planning Studies (DPS) of PDU BUSECO

Published by Energy Regulatory Commission(ERC) on June 17, 2022.
Requested from ERC by N. Compay at 10:25 AM on June 17, 2022.
Purpose: To develop an interactive Geographical Information System Map.
Date of Coverage: 01/01/2017 - 12/31/2021
Tracking no: #ERC-229367524559

2017-2021 Distribution Planning Studies (DPS) of PDU CEPALCO

Published by Energy Regulatory Commission(ERC) on June 17, 2022.
Requested from ERC by N. Compay at 10:20 AM on June 17, 2022.
Purpose: research
Date of Coverage: 01/01/2017 - 12/31/2021
Tracking no: #ERC-261616025823

Reliability Indices of BUSECO's substations every year 2017-2021

Published by Energy Regulatory Commission(ERC) on June 17, 2022.
Requested from ERC by N. Compay at 10:07 AM on June 17, 2022.
Purpose: To develop an interactive Geographical Information System Map. Identify reliability scales
Date of Coverage: 01/01/2017 - 06/15/2022
Tracking no: #ERC-113475564776

Reliability Indices of CEPALCO's substations every year 2017-2021

Published by Energy Regulatory Commission(ERC) on June 17, 2022.
Requested from ERC by N. Compay at 10:03 AM on June 17, 2022.
Purpose: To develop an interactive Geographical Information System Map. Identify reliability scales
Date of Coverage: 01/01/2017 - 12/31/2021
Tracking no: #ERC-592179286915

Electricity Sales of BUSECO every month from Jan 2017- Dec 2021

Published by Energy Regulatory Commission(ERC) on June 16, 2022.
Requested from ERC by N. Compay at 10:30 PM on June 16, 2022.
Purpose: To develop an existing power distribution utilities study
Date of Coverage: 01/01/2017 - 12/31/2021
Tracking no: #ERC-775725276398

Peak Loading of all of BUSECO’s substations 2017-2021, forecasted to 2026

Published by Energy Regulatory Commission(ERC) on June 16, 2022.
Requested from ERC by N. Compay at 10:28 PM on June 16, 2022.
Purpose: To develop an interactive Geographical Information System Map. Identify load growth and load pattern
Date of Coverage: 01/01/2017 - 12/31/2021
Tracking no: #ERC-739161157112

2017-2021 Distribution Development Plan (DDP) of PDU BUSECO, as per PDC 2017, Sec. 5.2.5.2

Published by Energy Regulatory Commission(ERC) on June 16, 2022.
Requested from ERC by N. Compay at 10:24 PM on June 16, 2022.
Purpose: existing power distribution Study
Date of Coverage: 01/01/2017 - 12/31/2021
Tracking no: #ERC-797029116588

BUSECO Existing Simple and Geographic Single Line Diagram

Published by Energy Regulatory Commission(ERC) on June 16, 2022.
Requested from ERC by N. Compay at 10:22 PM on June 16, 2022.
Purpose: To develop a Geographic Information System Map showing 500kV 230kV 69kV, 34.5kV, and 13.8kv lines
Date of Coverage: 01/01/2017 - 06/15/2022
Tracking no: #ERC-412499032026

Peak Loading of all of CEPALCO’s substations 2017-2021, forecasted to 2026

Published by Energy Regulatory Commission(ERC) on June 16, 2022.
Requested from ERC by N. Compay at 10:07 PM on June 16, 2022.
Purpose: To develop an interactive Geographical Information System Map. Identify load growth and load pattern
Date of Coverage: 01/01/2017 - 12/31/2021
Tracking no: #ERC-048485745488

CEPALCO Existing Simple and Geographic Single Line Diagram

Published by Energy Regulatory Commission(ERC) on June 16, 2022.
Requested from ERC by N. Compay at 09:48 PM on June 16, 2022.
Purpose: To develop a Geographic Information System Map showing 500kV 230kV 69kV, 34.5kV, and 13.8kv lines
Date of Coverage: 01/01/2017 - 06/15/2022
Tracking no: #ERC-710665367249

List of Rooftop Solar Projects Installed/ Net metered Solar Projects 2022

Published by Energy Regulatory Commission(ERC) on June 15, 2022.
Requested from ERC by M. Azurin at 11:11 PM on June 15, 2022.
Purpose: Research & Development
Date of Coverage: 01/01/2000 - 06/15/2022
Tracking no: #ERC-554308098562

ERC rate cases of Solar Power Plants in the Philippines

Published by Energy Regulatory Commission(ERC) on June 14, 2022.
Requested from ERC by T. Solon at 04:03 PM on June 14, 2022.
Purpose: Research
Date of Coverage: 01/01/2014 - 06/14/2022
Tracking no: #ERC-694567049754

ERC rate cases of Solar Power Plants in the Philippines

Published by Energy Regulatory Commission(ERC) on June 14, 2022.
Requested from ERC by T. Solon at 03:24 PM on June 14, 2022.
Purpose: Research
Date of Coverage: 01/01/2014 - 06/14/2022
Tracking no: #ERC-771400284373

2021 System Loss of Private Distribution Utilities & Electric Cooperatives

Published by Energy Regulatory Commission(ERC) on June 7, 2022.
Requested from ERC by L. Aguilar at 04:54 PM on June 7, 2022.
Purpose: Research
Date of Coverage: 01/01/2021 - 12/31/2021
Tracking no: #ERC-412327990622

Power Supply Agreement - Therma Luzon Inc, Therma Visayas Inc, Therma South Inc

Published by Energy Regulatory Commission(ERC) on June 6, 2022.
Requested from ERC by J. Leosala at 07:18 PM on June 6, 2022.
Purpose: Research
Date of Coverage: 01/01/2022 - 05/01/2022
Tracking no: #ERC-192835799603

cost of electic consumption

Published by Energy Regulatory Commission(ERC) on June 6, 2022.
Requested from ERC by R. Marcos at 01:13 PM on June 6, 2022.
Purpose: freedom of information to know how much how it was computed by meralco
Date of Coverage: 06/06/2022 - 06/06/2022
Tracking no: #ERC-830589673871

SAIFI and SAIDI of the Distribution Utilities in Cebu

Published by Energy Regulatory Commission(ERC) on June 2, 2022.
Requested from ERC by T. Solon at 09:36 AM on June 2, 2022.
Purpose: Research on Cebu power sector
Date of Coverage: 01/01/2019 - 12/31/2021
Tracking no: #ERC-012492122453

ERC rate cases of Solar Power Plants in the Philippines

Published by Energy Regulatory Commission(ERC) on May 31, 2022.
Requested from ERC by T. Solon at 11:50 AM on May 31, 2022.
Purpose: Research
Date of Coverage: 01/01/2014 - 12/31/2021
Tracking no: #ERC-112160076273

Data/Documentation on Smart Metering in the Philippines

Published by Energy Regulatory Commission(ERC) on May 30, 2022.
Requested from ERC by D. De Mesa at 09:29 AM on May 30, 2022.
Purpose: Research
Date of Coverage: 01/01/2020 - 05/30/2022
Tracking no: #ERC-060531909915

Monthly electricity consumption per DU from 2014-2021 per user type

Published by Energy Regulatory Commission(ERC) on May 26, 2022.
Requested from ERC by R. Rabanzo at 03:13 PM on May 26, 2022.
Purpose: Research
Date of Coverage: 01/01/2014 - 12/30/2021
Tracking no: #ERC-610045440690

Breakdown of project cost and operation and maintenance cost of SPTC (ERC Case no. 2017-094RC)

Published by Energy Regulatory Commission(ERC) on May 26, 2022.
Requested from ERC by J. Dorado at 09:09 AM on May 26, 2022.
Purpose: Research on total cost trend, particularly the total cost of Solar Philippines, being the largest
Date of Coverage: 10/19/2017 - 05/26/2022
Tracking no: #ERC-244341370202

Monthly Generation Rates/Charges of Private Utilities and Electric Cooperatives

Published by Energy Regulatory Commission(ERC) on May 24, 2022.
Requested from ERC by C. Moral at 09:34 AM on May 24, 2022.
Purpose: Research
Date of Coverage: 01/01/2020 - 04/30/2022
Tracking no: #ERC-348515226785

Detailed Annual kW Demand of Batanes

Published by Energy Regulatory Commission(ERC) on May 23, 2022.
Requested from ERC by K. Llamas at 04:43 PM on May 23, 2022.
Purpose: Research Paper
Date of Coverage: 01/01/2013 - 12/31/2021
Tracking no: #ERC-279580488151

About this agency

The Energy Regulatory Commission is an independent, quasi-judicial regulatory body of the electric power industry.

Make a Request
Agency Information Inventory

list of all available information