Department of Public Works and Highways

Browse over 6022 request from this government agency

Average International Roughness Index (IRI) per Region for the period 2012 to 2024

Published by Department of Public Works and Highways(DPWH) on June 20, 2025.
Requested from DPWH by L. Galinea at 09:35 AM on June 20, 2025.
Purpose: Research and development
Tracking no: #DPWH-941572120639

I would like to know who is the won in the bid of project ID 24E00341

Published by Department of Public Works and Highways(DPWH) on June 19, 2025.
Requested from DPWH by J. Benjamin at 04:07 PM on June 19, 2025.
Purpose: for verification
Tracking no: #DPWH-060311355523

Road Roughness Index per Region, 2012 to 2024

Published by Department of Public Works and Highways(DPWH) on June 19, 2025.
Requested from DPWH by L. Galinea at 02:36 PM on June 19, 2025.
Purpose: Research and Development
Tracking no: #DPWH-797985625541

Construction of 8.5m x 9m One (1) Storey MultiPupose Building with Toilet and 3- Chambered Septic Vault

Published by Department of Public Works and Highways(DPWH) on June 19, 2025.
Requested from DPWH by M. Verdin at 11:47 AM on June 19, 2025.
Purpose: BUILDING REFERENCE
Tracking no: #DPWH-415587645117

CONSTRUCTION OF MUTI PURPOSE BUILDING

Published by Department of Public Works and Highways(DPWH) on June 19, 2025.
Requested from DPWH by M. Verdin at 11:37 AM on June 19, 2025.
Purpose: BUILDING REFERENCE
Tracking no: #DPWH-202086282803

Traffic Impact Assessment

Published by Department of Public Works and Highways(DPWH) on March 20, 2025.
Requested from DPWH by F. De Dios at 11:23 AM on March 20, 2025.
Purpose: Research and development
Tracking no: #DPWH-088223338550

my PE and ME pledge projects as of March 2025

Published by Department of Public Works and Highways(DPWH) on March 20, 2025.
Requested from DPWH by J. Barbosa at 10:36 AM on March 20, 2025.
Purpose: for verification
Tracking no: #DPWH-758782019495

road width and length

Published by Department of Public Works and Highways(DPWH) on March 20, 2025.
Requested from DPWH by C. Daculla at 10:17 AM on March 20, 2025.
Purpose: Research Purposes
Tracking no: #DPWH-391499522435

Labor and equipment productivity rates for construction

Published by Department of Public Works and Highways(DPWH) on March 19, 2025.
Requested from DPWH by C. Taruc at 09:27 PM on March 19, 2025.
Purpose: for Capstone Design Project
Tracking no: #DPWH-780276412115

Multi Criterial Analysis (MCA) and DPWH DGCS

Published by Department of Public Works and Highways(DPWH) on March 19, 2025.
Requested from DPWH by C. Javier at 01:54 PM on March 19, 2025.
Purpose: To use in our current Project with DPWH Urgent Bridges
Tracking no: #DPWH-765862907099

Latest CMPD and DUPA stated in DO 232 s2024, DO 50 s2024, DO 31, s2024

Published by Department of Public Works and Highways(DPWH) on March 19, 2025.
Requested from DPWH by C. Javier at 10:13 AM on March 19, 2025.
Purpose: For the Goverment project DPWH - preparation of BoQ for Bridges, Roads and Highways.
Tracking no: #DPWH-036453687372

CCPE Accreditation Result

Published by Department of Public Works and Highways(DPWH) on March 19, 2025.
Requested from DPWH by M. Ramel at 09:03 AM on March 19, 2025.
Purpose: Verification purposes
Tracking no: #DPWH-249065956810

ACEL RATES

Published by Department of Public Works and Highways(DPWH) on March 19, 2025.
Requested from DPWH by L. Navarro at 07:41 AM on March 19, 2025.
Purpose: Capstone Design
Tracking no: #DPWH-011531368255

Road Conditions

Published by Department of Public Works and Highways(DPWH) on March 18, 2025.
Requested from DPWH by R. Caldona at 06:29 PM on March 18, 2025.
Purpose: Undergraduate Thesis
Tracking no: #DPWH-802324500550

Unit Cost and Duration of Infrastructure Projects

Published by Department of Public Works and Highways(DPWH) on March 18, 2025.
Requested from DPWH by C. Mayor at 04:32 PM on March 18, 2025.
Purpose: Research and Development
Tracking no: #DPWH-403495420468

Request of Sibut Bridge and Tulat Bridge San Jose City, Nueva - Geotechnical Investigation Report

Published by Department of Public Works and Highways(DPWH) on March 18, 2025.
Requested from DPWH by J. Agustin at 11:37 AM on March 18, 2025.
Purpose: For thesis/research purposes
Tracking no: #DPWH-972347817865

Complete Plan of a 4-Storey Multi-Purpose Building with Roof Deck

Published by Department of Public Works and Highways(DPWH) on March 18, 2025.
Requested from DPWH by J. Villaflor at 11:13 AM on March 18, 2025.
Purpose: educational purposes
Tracking no: #DPWH-667274908375

Dpwh Project Engineer Request

Published by Department of Public Works and Highways(DPWH) on March 17, 2025.
Requested from DPWH by X. Patnaan at 10:20 PM on March 17, 2025.
Purpose: For Verification purposes only
Tracking no: #DPWH-453081251150

List of DPWH Contracts Pledged Under my Name as Materials Engineer

Published by Department of Public Works and Highways(DPWH) on March 17, 2025.
Requested from DPWH by B. Barquin at 08:49 PM on March 17, 2025.
Purpose: For self monitoring and verification.
Tracking no: #DPWH-747171997977

Geotechnical Investigation Report

Published by Department of Public Works and Highways(DPWH) on March 17, 2025.
Requested from DPWH by V. Abundo at 06:56 PM on March 17, 2025.
Purpose: Undergraduate Research
Tracking no: #DPWH-650307969312

Bill of Quantities for multi-story parking building

Published by Department of Public Works and Highways(DPWH) on March 17, 2025.
Requested from DPWH by N. Batayola at 04:29 PM on March 17, 2025.
Purpose: Capstone Design Project for CE
Tracking no: #DPWH-361863770803

Excel template of DUPA, POW, ABC and output per per item of DPWH Vertical and Horizontal Projects

Published by Department of Public Works and Highways(DPWH) on March 17, 2025.
Requested from DPWH by H. Matias at 03:30 PM on March 17, 2025.
Purpose: Reference in Making Estimate for Bid Proposal
Tracking no: #DPWH-095045105472

Geotechnical Evaluation Report of the soil in Brgy. Dariao, Caramoran, Catanduanes

Published by Department of Public Works and Highways(DPWH) on March 17, 2025.
Requested from DPWH by I. Romano at 02:19 PM on March 17, 2025.
Purpose: Capstone Design Project
Tracking no: #DPWH-728572472572

Data Acquisition for DRT, Bulacan

Published by Department of Public Works and Highways(DPWH) on March 17, 2025.
Requested from DPWH by A. Rombano at 02:18 PM on March 17, 2025.
Purpose: Undergraduate Thesis
Tracking no: #DPWH-407689737666

Geotechnical Evaluation Report in the soil in Barangay Dariao, Caramonan, Catanduanes.

Published by Department of Public Works and Highways(DPWH) on March 17, 2025.
Requested from DPWH by F. Baloro at 11:34 AM on March 17, 2025.
Purpose: Capstone Design Project
Tracking no: #DPWH-051294626657

Average Speed Data

Published by Department of Public Works and Highways(DPWH) on March 16, 2025.
Requested from DPWH by C. Canlas at 11:40 PM on March 16, 2025.
Purpose: Undergraduate Thesis
Tracking no: #DPWH-090522021462

Geotechnical Evaulation report of the soil in Brgy. Bal-Marcoville Baguio City

Published by Department of Public Works and Highways(DPWH) on March 16, 2025.
Requested from DPWH by N. Batayola at 02:08 PM on March 16, 2025.
Purpose: Capstone Design Project for Civil Engineering
Tracking no: #DPWH-042714713434

Data on construction Companies and Workforce

Published by Department of Public Works and Highways(DPWH) on March 16, 2025.
Requested from DPWH by A. Santos at 09:45 AM on March 16, 2025.
Purpose: Thesis Paper
Tracking no: #DPWH-571931814155

Geotechnical Evaluation Report of the soil in Brgy. Boi, Boac, Marinduque

Published by Department of Public Works and Highways(DPWH) on March 14, 2025.
Requested from DPWH by I. Romano at 04:04 PM on March 14, 2025.
Purpose: Research and Development
Tracking no: #DPWH-898958566208

Geotechnical Evaluation Report of the soil in Brgy. Dulangan, Baco, Oriental Mindoro

Published by Department of Public Works and Highways(DPWH) on March 14, 2025.
Requested from DPWH by I. Romano at 04:01 PM on March 14, 2025.
Purpose: Research and Development
Tracking no: #DPWH-806159437041

Geotechnical Evaluation Report of the soil in Brgy. Dariao, Caramoran, Catanduanes

Published by Department of Public Works and Highways(DPWH) on March 14, 2025.
Requested from DPWH by I. Romano at 03:28 PM on March 14, 2025.
Purpose: Research and Development
Tracking no: #DPWH-349070680933

Drainage System near Adamson University

Published by Department of Public Works and Highways(DPWH) on March 14, 2025.
Requested from DPWH by F. Refe at 09:47 AM on March 14, 2025.
Purpose: Thesis purposes
Tracking no: #DPWH-810017967383

DPWH-CMPD

Published by Department of Public Works and Highways(DPWH) on March 14, 2025.
Requested from DPWH by J. Dismaya at 06:46 AM on March 14, 2025.
Purpose: Cost Estimate
Tracking no: #DPWH-423542260126

Geotechnical Investigation Report in Bulacan

Published by Department of Public Works and Highways(DPWH) on March 14, 2025.
Requested from DPWH by J. Ranches at 02:07 AM on March 14, 2025.
Purpose: Capstone Design Project
Tracking no: #DPWH-902246124223

Geotechnical Evaluation Report

Published by Department of Public Works and Highways(DPWH) on March 13, 2025.
Requested from DPWH by A. Rombano at 11:48 PM on March 13, 2025.
Purpose: Undergraduate Thesis
Tracking no: #DPWH-958494357788

Traffic Congestion Data in Dipolog

Published by Department of Public Works and Highways(DPWH) on March 13, 2025.
Requested from DPWH by C. Canlas at 10:56 PM on March 13, 2025.
Purpose: Undergraduate Thesis
Tracking no: #DPWH-207375234231

CAGAYAN DE ORO CITY HALL FLOOR PLAN

Published by Department of Public Works and Highways(DPWH) on March 13, 2025.
Requested from DPWH by H. Dagondon at 05:08 PM on March 13, 2025.
Purpose: SCHOOL RESEARCH For Cagayan De Oro City Hall and It's architecture.
Tracking no: #DPWH-604970582130

Geothecnical Report Cabuyao, Laguna

Published by Department of Public Works and Highways(DPWH) on March 13, 2025.
Requested from DPWH by J. Wong at 02:07 PM on March 13, 2025.
Purpose: Design Project
Tracking no: #DPWH-829479022916

Muntinlupa City CMPD and labor rates

Published by Department of Public Works and Highways(DPWH) on March 13, 2025.
Requested from DPWH by A. Carolino at 11:20 AM on March 13, 2025.
Purpose: Capstone Design Project
Tracking no: #DPWH-364905138189

CMPD and Latest Standard Labor rates in Muntinlupa City

Published by Department of Public Works and Highways(DPWH) on March 13, 2025.
Requested from DPWH by A. Carolino at 11:19 AM on March 13, 2025.
Purpose: Capstone Design Project
Tracking no: #DPWH-973365728652

Geotechnical Investigation Report (GIR)

Published by Department of Public Works and Highways(DPWH) on March 13, 2025.
Requested from DPWH by V. Abundo at 08:44 AM on March 13, 2025.
Purpose: Undergraduate research
Tracking no: #DPWH-180089196212

Elevator Requirement for Hotel and Convention Center

Published by Department of Public Works and Highways(DPWH) on March 13, 2025.
Requested from DPWH by K. Mendoza at 12:42 AM on March 13, 2025.
Purpose: For educational purposes only
Tracking no: #DPWH-154239110096

Feasibility Study - Alaminos-Bani Bypass Road

Published by Department of Public Works and Highways(DPWH) on March 12, 2025.
Requested from DPWH by M. Castillo at 10:10 PM on March 12, 2025.
Purpose: Academic Research
Tracking no: #DPWH-640858334550

Geotechnical Report on Bubong, Lanao Del Norte

Published by Department of Public Works and Highways(DPWH) on March 12, 2025.
Requested from DPWH by K. Pecson at 06:18 PM on March 12, 2025.
Purpose: Design Project
Tracking no: #DPWH-208735404827

Geotechnical Investigation Reports

Published by Department of Public Works and Highways(DPWH) on March 12, 2025.
Requested from DPWH by B. Lota at 06:03 PM on March 12, 2025.
Purpose: Thesis Purposes
Tracking no: #DPWH-762503086304

Geotechnical Report in Isabela

Published by Department of Public Works and Highways(DPWH) on March 12, 2025.
Requested from DPWH by A. Belarmino at 04:36 PM on March 12, 2025.
Purpose: Capstone Project
Tracking no: #DPWH-052054886717

DATA AQUISITION

Published by Department of Public Works and Highways(DPWH) on March 12, 2025.
Requested from DPWH by E. Mondonedo at 03:30 PM on March 12, 2025.
Purpose: Capstone Design
Tracking no: #DPWH-712570432117

Construction Materials Price List

Published by Department of Public Works and Highways(DPWH) on March 12, 2025.
Requested from DPWH by J. Toco at 02:59 PM on March 12, 2025.
Purpose: Reference for Cost Estimation
Tracking no: #DPWH-030553487498

CLUP, CDP and etc. of Manila City

Published by Department of Public Works and Highways(DPWH) on March 11, 2025.
Requested from DPWH by N. Josol at 06:39 PM on March 11, 2025.
Purpose: The Information that I will receive will be use for Architectural Research Study
Tracking no: #DPWH-559704297634

CLUP, CDP and etc. of Baguio City

Published by Department of Public Works and Highways(DPWH) on March 11, 2025.
Requested from DPWH by N. Josol at 05:32 PM on March 11, 2025.
Purpose: For Architectural Research
Tracking no: #DPWH-165781970395

CMPD

Published by Department of Public Works and Highways(DPWH) on March 11, 2025.
Requested from DPWH by G. De Jesus at 03:03 PM on March 11, 2025.
Purpose: DUPA and Cost Estimates Preparation
Tracking no: #DPWH-331482408877

Geotechnical Evaluation Report of the Soil in Brgy. Guiamlong, Caramoran, Catanduanes.

Published by Department of Public Works and Highways(DPWH) on March 11, 2025.
Requested from DPWH by F. Baloro at 09:38 AM on March 11, 2025.
Purpose: Capstone Design Project
Tracking no: #DPWH-520297568081

AADT and Percent Heavies Computation

Published by Department of Public Works and Highways(DPWH) on March 10, 2025.
Requested from DPWH by R. Lavilla at 10:43 PM on March 10, 2025.
Purpose: for Thesis.
Tracking no: #DPWH-403678200678

Labor and Equipment Rates 2025 Mimaropa

Published by Department of Public Works and Highways(DPWH) on March 10, 2025.
Requested from DPWH by J. Bungag at 11:44 AM on March 10, 2025.
Purpose: Cost Estimation
Tracking no: #DPWH-962354765267

Data

Published by Department of Public Works and Highways(DPWH) on March 10, 2025.
Requested from DPWH by R. Duque at 10:44 AM on March 10, 2025.
Purpose: Thesis paper
Tracking no: #DPWH-156575923447

Materials Engineer2

Published by Department of Public Works and Highways(DPWH) on March 10, 2025.
Requested from DPWH by J. Yabut at 08:08 AM on March 10, 2025.
Purpose: Monitoring of Handled Project to prevent Illegal usage of Accreditation.
Tracking no: #DPWH-996847404211

DPWH Contract ID 23L0-0199

Published by Department of Public Works and Highways(DPWH) on March 10, 2025.
Requested from DPWH by J. Quizada at 12:12 AM on March 10, 2025.
Purpose: Study, Research and Development
Tracking no: #DPWH-074001928346

Streamflow Data of Baluarte River (2000 to 2024)

Published by Department of Public Works and Highways(DPWH) on March 9, 2025.
Requested from DPWH by C. Zurbito at 10:09 PM on March 9, 2025.
Purpose: Thesis and Research
Tracking no: #DPWH-438032657318

DPWH Construction Materials Unit Price List for NCR, Manila City (2024-2025)

Published by Department of Public Works and Highways(DPWH) on March 9, 2025.
Requested from DPWH by K. Dantes at 01:14 PM on March 9, 2025.
Purpose: Reference for our final project requirement in the Construction Methods and Project Management course.
Tracking no: #DPWH-542457657527

DGCS BRIDGE

Published by Department of Public Works and Highways(DPWH) on March 9, 2025.
Requested from DPWH by J. Padua at 12:31 AM on March 9, 2025.
Purpose: Research and design reference
Tracking no: #DPWH-599705087454

Rajah Sulayman Park

Published by Department of Public Works and Highways(DPWH) on March 8, 2025.
Requested from DPWH by C. Tresvalles at 06:24 PM on March 8, 2025.
Purpose: Thesis purposes
Tracking no: #DPWH-217625725695

Requesting a GIS file of Kidapawan City

Published by Department of Public Works and Highways(DPWH) on March 8, 2025.
Requested from DPWH by J. Doroon at 12:12 PM on March 8, 2025.
Purpose: Research and Development
Tracking no: #DPWH-749429225640

National Standards of Fiber Cement Board

Published by Department of Public Works and Highways(DPWH) on March 8, 2025.
Requested from DPWH by M. Gadia at 08:04 AM on March 8, 2025.
Purpose: Research and Development
Tracking no: #DPWH-347822119605

DATA AQUISITION FOR CAPSTONE

Published by Department of Public Works and Highways(DPWH) on March 7, 2025.
Requested from DPWH by E. Mondonedo at 04:29 PM on March 7, 2025.
Purpose: Capstone Design
Tracking no: #DPWH-529323007399

Typical floor plan and List of spaces of Government Services

Published by Department of Public Works and Highways(DPWH) on March 6, 2025.
Requested from DPWH by J. Mendoza at 09:13 PM on March 6, 2025.
Purpose: Undergraduate Thesis
Tracking no: #DPWH-248029037571

Certificate of Building Structural Integrity

Published by Department of Public Works and Highways(DPWH) on March 6, 2025.
Requested from DPWH by S. Alba at 05:43 PM on March 6, 2025.
Purpose: for request of SARO
Tracking no: #DPWH-006641366728

Request for Cost Estimates and Material Information for Bridge Design

Published by Department of Public Works and Highways(DPWH) on March 6, 2025.
Requested from DPWH by R. Donguya at 02:55 PM on March 6, 2025.
Purpose: CE Design Project 2 (Capstone 2 / Thesis)
Tracking no: #DPWH-170285976766

Request for Proximity to Roads Data in Eastern Pangasinan

Published by Department of Public Works and Highways(DPWH) on March 6, 2025.
Requested from DPWH by M. Mamongay at 02:51 PM on March 6, 2025.
Purpose: Research
Tracking no: #DPWH-513863917662

Capacity of Solar Powered STP at Vitas River

Published by Department of Public Works and Highways(DPWH) on March 6, 2025.
Requested from DPWH by J. Toco at 10:52 AM on March 6, 2025.
Purpose: As reference for design and costing.
Tracking no: #DPWH-773516705980

Geotechnical Report for Slope Ares

Published by Department of Public Works and Highways(DPWH) on March 6, 2025.
Requested from DPWH by S. Ferrer at 09:53 AM on March 6, 2025.
Purpose: civil engineering thesis
Tracking no: #DPWH-918175101064

Mean Certificate of Fiber Cement Board

Published by Department of Public Works and Highways(DPWH) on March 6, 2025.
Requested from DPWH by M. Gadia at 09:40 AM on March 6, 2025.
Purpose: School Thesis
Tracking no: #DPWH-951636869269

Geotechnical Report in Brgy Cabutagan Lupi Camarines Sur

Published by Department of Public Works and Highways(DPWH) on March 6, 2025.
Requested from DPWH by K. Conde at 09:39 AM on March 6, 2025.
Purpose: Thesis ( Capstone Design 1)
Tracking no: #DPWH-369212756412

Madlum River Data

Published by Department of Public Works and Highways(DPWH) on March 6, 2025.
Requested from DPWH by J. Ranches at 09:25 AM on March 6, 2025.
Purpose: For capstone design project.
Tracking no: #DPWH-815057052930

REQUEST FOR MATERIALS UNIT PRICE

Published by Department of Public Works and Highways(DPWH) on March 6, 2025.
Requested from DPWH by M. De La Cruz at 09:12 AM on March 6, 2025.
Purpose: Project costing for the project of BFP-NCR
Tracking no: #DPWH-646334890716

REQUEST FOR THE UPDATED CMPD, LABOR RATES AND EQUIPMENT RATES

Published by Department of Public Works and Highways(DPWH) on March 5, 2025.
Requested from DPWH by A. Teves at 05:06 PM on March 5, 2025.
Purpose: Cost Estimation References
Tracking no: #DPWH-507932520826

Geotechnical Reports and Soil Properties

Published by Department of Public Works and Highways(DPWH) on March 5, 2025.
Requested from DPWH by J. Ranches at 04:00 PM on March 5, 2025.
Purpose: Casptone design project
Tracking no: #DPWH-953740731081

AADT, Pavement Age, and Traffic Volume of Cebu City Roads

Published by Department of Public Works and Highways(DPWH) on March 4, 2025.
Requested from DPWH by J. Labastilla at 05:01 PM on March 4, 2025.
Purpose: Undergraduate Capstone Project
Tracking no: #DPWH-676539545788

List of Contracts Implemented by Contractor’s/Consultant’s Materials Engineers Under Engr. Vincent A. Matalines (CCME 1)

Published by Department of Public Works and Highways(DPWH) on March 4, 2025.
Requested from DPWH by V. Matalines at 03:29 AM on March 4, 2025.
Purpose: To ensure that there are no contractors who are using my Materials Engineer Accreditation under my name without my consent
Tracking no: #DPWH-028928250127

Conduct of Feasibility Studies/Preliminary and Detailed Engineering/Economic Analysis/Technical Studies/Traffic Impact/ Assessment For Catanduanes-Camarines Sur Friendship Bridge, Camarines Sur and Catanduanes

Published by Department of Public Works and Highways(DPWH) on March 4, 2025.
Requested from DPWH by F. Abelong at 12:06 AM on March 4, 2025.
Purpose: For Capstone (Education) Purpose
Tracking no: #DPWH-576463399313

Geotechnical Investigation Report of Brgy. Bagong Sikat, Pinili, Porais, Villa Joson, Tabulac, San Jose City, Nueva Ecija

Published by Department of Public Works and Highways(DPWH) on March 3, 2025.
Requested from DPWH by J. Marana at 07:28 PM on March 3, 2025.
Purpose: For the conduct of thesis/research purposes
Tracking no: #DPWH-984786063501

Geotechnical Evaluation Report of the soil in Kalabugao, Rd. Impasug-ong, Northern Mindanao.

Published by Department of Public Works and Highways(DPWH) on March 3, 2025.
Requested from DPWH by F. Baloro at 12:22 PM on March 3, 2025.
Purpose: Capstone Design Project
Tracking no: #DPWH-733084235899

Flood inundation depth and discharge of Catanduanes Island

Published by Department of Public Works and Highways(DPWH) on March 3, 2025.
Requested from DPWH by F. Nacion at 11:57 AM on March 3, 2025.
Purpose: Undergraduate Thesis
Tracking no: #DPWH-562103145401

Geotechnical Evaluation Report of the soil in Davao-Sarangani Coastal Road, Caputian, Sta. Maria, 8010 Davao del Sur.

Published by Department of Public Works and Highways(DPWH) on March 3, 2025.
Requested from DPWH by F. Baloro at 11:57 AM on March 3, 2025.
Purpose: Capstone Design Project
Tracking no: #DPWH-247829732063

Geotechnical Evaluation Report of the Soil in Puerto Princesa, MIMAROPA.

Published by Department of Public Works and Highways(DPWH) on March 3, 2025.
Requested from DPWH by F. Baloro at 11:42 AM on March 3, 2025.
Purpose: Capstone Design Project
Tracking no: #DPWH-353817465862

Standard Drainage size

Published by Department of Public Works and Highways(DPWH) on March 3, 2025.
Requested from DPWH by E. Domingo at 02:23 AM on March 3, 2025.
Purpose: Research purposes
Tracking no: #DPWH-646175349492

2024 Annual Average Daily Traffic

Published by Department of Public Works and Highways(DPWH) on March 2, 2025.
Requested from DPWH by J. Ocbina at 11:05 PM on March 2, 2025.
Purpose: Estimation of the Gross Value Added of Land Transportation for the 2024 Regional and Provincial Accounts of the Philippines
Tracking no: #DPWH-751526308049

FLCD

Published by Department of Public Works and Highways(DPWH) on March 2, 2025.
Requested from DPWH by M. Isip at 12:26 PM on March 2, 2025.
Purpose: Thesis / Research
Tracking no: #DPWH-379991221685

Request for Traffic Volume Data for vehicles traveling from Davao City to Cagayan de Oro via Bukidnon

Published by Department of Public Works and Highways(DPWH) on Feb. 28, 2025.
Requested from DPWH by B. Leopoldo at 10:54 PM on Feb. 28, 2025.
Purpose: Architectural Thesis
Tracking no: #DPWH-474293814137

CMPD

Published by Department of Public Works and Highways(DPWH) on Feb. 28, 2025.
Requested from DPWH by T. Fabila at 04:32 PM on Feb. 28, 2025.
Purpose: COST ESTIMATION
Tracking no: #DPWH-359703215547

Congestion Data in Region IV-A

Published by Department of Public Works and Highways(DPWH) on Feb. 28, 2025.
Requested from DPWH by K. Ignacio at 02:08 PM on Feb. 28, 2025.
Purpose: Research and Development
Tracking no: #DPWH-784106462361

Traffic Data in Rizal Avenue, Bantay, Ilocos Sur

Published by Department of Public Works and Highways(DPWH) on Feb. 28, 2025.
Requested from DPWH by J. Rambonga at 10:19 AM on Feb. 28, 2025.
Purpose: Thesis Project
Tracking no: #DPWH-892032836362

Construction Material Pricelist Request

Published by Department of Public Works and Highways(DPWH) on Feb. 28, 2025.
Requested from DPWH by B. Martin at 08:02 AM on Feb. 28, 2025.
Purpose: Updating our pricelist for future projects
Tracking no: #DPWH-822297468734

Request for Traffic Volume and Average Vehicle speed along EDSA (Monumento to Bagong Barrio) for Undergraduate Thesis

Published by Department of Public Works and Highways(DPWH) on Feb. 27, 2025.
Requested from DPWH by E. Ferrer at 10:46 PM on Feb. 27, 2025.
Purpose: Undergraduate Thesis, and Data gathering
Tracking no: #DPWH-756581422262

Hydrological data of the Taguibo River Watershed

Published by Department of Public Works and Highways(DPWH) on Feb. 27, 2025.
Requested from DPWH by C. Granado at 10:11 AM on Feb. 27, 2025.
Purpose: Undergraduate Thesis
Tracking no: #DPWH-852606050931

Geotechnical Report in Ligaya, Pasig

Published by Department of Public Works and Highways(DPWH) on Feb. 26, 2025.
Requested from DPWH by J. Ayon at 04:18 PM on Feb. 26, 2025.
Purpose: for Design Project in Civil Engineering
Tracking no: #DPWH-133873821552

DPWH AADT

Published by Department of Public Works and Highways(DPWH) on Feb. 26, 2025.
Requested from DPWH by T. Hilado at 01:18 PM on Feb. 26, 2025.
Purpose: Research and development
Tracking no: #DPWH-108499715067

Traffic Data

Published by Department of Public Works and Highways(DPWH) on Feb. 26, 2025.
Requested from DPWH by S. Barraza at 11:56 AM on Feb. 26, 2025.
Purpose: Research Purposes
Tracking no: #DPWH-552411030576

Traffic Data in Rizal Avenue, Bantay, Ilocos Sur

Published by Department of Public Works and Highways(DPWH) on Feb. 25, 2025.
Requested from DPWH by J. Rambonga at 03:31 PM on Feb. 25, 2025.
Purpose: Capstone Project
Tracking no: #DPWH-777815314735

Alignment of the proposed connecting road between Barangay Quinagasan and Gangahin, Pitogo, Quezon

Published by Department of Public Works and Highways(DPWH) on Feb. 25, 2025.
Requested from DPWH by M. Guevarra at 02:43 PM on Feb. 25, 2025.
Purpose: For research and development of a strategic risk reduction map as well as a map for aligning service utilities such as electricity, water, and internet.
Tracking no: #DPWH-113094467387

Alignment of Quinagasan-Gangahin raod

Published by Department of Public Works and Highways(DPWH) on Feb. 25, 2025.
Requested from DPWH by M. Guevarra at 02:34 PM on Feb. 25, 2025.
Purpose: For Research purposes. the data/map will be needed for the feasibility study of the alignment of service utilities (internet, electricity, and water), as well as in the creation of hazards maps for risk reduction and management
Tracking no: #DPWH-992599879867

About this agency

The Department of Public Works and Highways ensures quality, efficiency, and safety of all infrastructures. It is responsible for the planning, design, construction, and maintenance of infrastructure, especially the national highways, flood control and water resources development system, and other public works in accordance with national development interest.

Make a Request
Agency Information Inventory

list of all available information